1 00:00:06,710 --> 00:00:04,550 at nasa's kennedy space center in 2 00:00:08,549 --> 00:00:06,720 florida technicians in the vehicle 3 00:00:10,150 --> 00:00:08,559 assembly building make additional 4 00:00:13,350 --> 00:00:10,160 imaging scans of space shuttle 5 00:00:15,990 --> 00:00:13,360 discovery's external fuel tank 6 00:00:17,910 --> 00:00:16,000 on december 29th technicians scanned 7 00:00:20,550 --> 00:00:17,920 below the external tank's foam 8 00:00:23,189 --> 00:00:20,560 insulation around the entire entertain 9 00:00:24,550 --> 00:00:23,199 section to look for any issues like 10 00:00:26,790 --> 00:00:24,560 cracks 11 00:00:29,349 --> 00:00:26,800 workers using computed radiography 12 00:00:31,429 --> 00:00:29,359 scanners that work like an x-ray machine 13 00:00:33,750 --> 00:00:31,439 by transmitting radiation through the 14 00:00:35,990 --> 00:00:33,760 tank's foam and metal skin 15 00:00:39,030 --> 00:00:36,000 the scans will help verify repairs 16 00:00:41,910 --> 00:00:39,040 associated with cracks on tops of two 21 17 00:00:43,830 --> 00:00:41,920 foot long u-shaped aluminum brackets 18 00:00:46,869 --> 00:00:43,840 called stringers which line the 19 00:00:48,310 --> 00:00:46,879 intertank and help engineers determine 20 00:00:50,630 --> 00:00:48,320 what caused the cracks during 21 00:00:53,350 --> 00:00:50,640 discovery's launch attempt on november 22 00:00:55,510 --> 00:00:53,360 5th managers and engineers will review 23 00:00:58,229 --> 00:00:55,520 the test data to determine the next 24 00:01:01,270 --> 00:00:58,239 course of action discovery's next launch 25 00:01:03,670 --> 00:01:01,280 opportunity for its sts-133 mission to 26 00:01:07,270 --> 00:01:03,680 the international space station is no 27 00:01:08,710 --> 00:01:07,280 earlier than february 3rd 28 00:01:12,550 --> 00:01:08,720 voltage cable 29 00:01:16,070 --> 00:01:12,560 ground cable and coolant lines 30 00:01:17,350 --> 00:01:16,080 so the control unit upstairs 31 00:01:20,070 --> 00:01:17,360 sends whatever 32 00:01:21,990 --> 00:01:20,080 kill voltage we need in amperage 33 00:01:24,230 --> 00:01:22,000 and there's a filament here that heats 34 00:01:29,510 --> 00:01:27,190 emits electrons 35 00:02:46,390 --> 00:01:29,520 those electrons are streamed to a target 36 00:02:51,350 --> 00:02:48,869 this is the image plate 37 00:02:52,949 --> 00:02:51,360 uh it takes place of the old film 38 00:02:55,030 --> 00:02:52,959 techniques 39 00:02:57,430 --> 00:02:55,040 and this sheet right here is the lead 40 00:03:00,149 --> 00:02:57,440 backing for a backscatter 41 00:03:02,229 --> 00:03:00,159 to prevent backscatter x-rays from 42 00:03:04,309 --> 00:03:02,239 changing any of the image patterns but 43 00:03:07,990 --> 00:03:04,319 all this is enclosed up there in a dark 44 00:03:14,550 --> 00:03:09,509 and then we seal it and it's ready for 45 00:03:26,630 --> 00:03:15,990 gonna go in 46 00:03:29,910 --> 00:03:28,630 and this is the film holder 47 00:04:08,789 --> 00:03:29,920 that will 48 00:04:12,070 --> 00:04:10,550 i position on on these stringer 49 00:04:15,270 --> 00:04:12,080 locations 50 00:04:17,670 --> 00:04:15,280 and correspond that with the x-ray 51 00:04:19,030 --> 00:04:17,680 equipment outside and that way we shoot 52 00:04:25,749 --> 00:04:19,040 the same stringer 53 00:04:47,590 --> 00:04:27,990 then to remove it just the opposite 54 00:04:47,600 --> 00:05:01,110 so